Case study · Power Generation

How we built a training progress dashboard for a power company

A power company's technical training team tracked each plant employee's classroom courses and on-the-job assessments in separate tabs, with no overall view. We built a dashboard that shows everyone's progress by phase, can be used at any plant, and has been extended for five years.

Client
Power generation company, technical training team, Florida
Built with
Excel, VBA, charts
Project size
Dashboard 8 hours, then several updates
In use
4+ years

Need Something Similar?

Describe your problem for a free, fixed-price quote within 24 hours.

We reply within 24 hours and treat all client data as sensitive. See our privacy policy.

The Challenge

New operators at the company's plants work through a series of phases. In each one they complete instructor-led courses and on-the-job performance measures, signed off by supervisors. The training director wanted a clear, professional view of where every employee stood, and was concerned that the in-house alternative would be functional but not something to put in front of managers. The solution also had to work for more than one plant.

Scope

After a call with the director and a colleague, we agreed an 8-hour project, to be delivered within two weeks:

  • a dashboard, built dynamically, showing each employee's progress through the courses and on-the-job measures;
  • a design that could be copied to other plants;
  • progress recorded once an employee starts a phase;
  • hyperlinks taking users straight to the right tab for each employee.

Decisions Along the Way

Two questions came up while building, and we put the options to the team rather than guessing:

  • Weighting. Courses had been weighted in the overall percentage complete. The team chose to remove the weighting so the overall figure reflects actual progress, while keeping separate course and on-the-job percentages on every sheet and the dashboard.
  • Moving to the next phase. We offered to use the last completion date as the start of the next phase, or to leave it blank. The team chose to have employees added to the next phase automatically when they finish one, with the start date entered by their supervisor, since there can be a gap before they begin.

The dashboard's charts were finalised with the team, and the project was delivered on time.

Extending the Dashboard

The following month we added a variance column showing actual against expected completion, green when ahead and red when behind, and instructions for adding a new phase, which we tested before handing over. A small change to links between worksheets followed in the summer. Later that year the director proposed a course selection tool for the training catalog, filtering courses and their prerequisites by criteria chosen through checkboxes. The team later came back to update its group of workbooks from the original project, and further development and an updater file followed over the next three years.

The Result

One viewof every employee's progress
Any plantcan use the same design
5 yearsof use and extensions

Managers could see who was on track, who was behind and who was ready for the next phase without opening every tab.

Why Excel, and Not a Learning Management System?

The training records already lived in Excel and supervisors were used to signing off progress there. A dashboard on top of the existing records gave the director the professional view wanted, in weeks, without a new system to procure and roll out.

Could This Work for Your Business?

The same approach suits training teams, apprenticeship schemes and any organisation tracking qualifications in stages. Send us your current tracker and we can usually get back to you with a fixed price within 24 hours.

Questions About Training Dashboards in Excel

Can Excel show training progress across phases?

Yes. The dashboard showed each employee's course and on-the-job progress by phase.

Can employees move to the next phase automatically?

Yes. Finishing a phase added them to the next one, with the start date entered by their supervisor.

Can it be used at more than one site?

Yes. It was designed so other plants could use the same structure.

Can it show who is behind schedule?

Yes. A variance column showed actual against expected completion in green or red.

What does a training dashboard cost?

We quote a fixed price after a free scoping call, and you only pay once you are happy with the finished work. At our current rates, a similar project would typically cost $1,200–$1,400.

Have a Spreadsheet Problem Like This?

Describe it in a few lines. We'll reply with a fixed-price quote within 24 hours.

Get my free quote