Smaller projects and quick fixes in this group, each summarised in a few paragraphs.
Automated transfer of housing schedules for a lintel manufacturer
Building products manufacturing · 3 hours, plus 4.5 hours for order processing
A manufacturer of steel lintels received housing schedules from house builders listing the lintels needed for each plot. Staff transferred these by hand from the incoming spreadsheet into the company's own blank master schedule.
The sales team wrote an extremely detailed step-by-step specification, so our quote simply referred to it rather than repeating each step. We built a macro that opens the blank master copy from its fixed location on the company's server, extracts the data from the incoming schedule and populates the template.
When the first live schedule showed garages needed including, we extended the macro to cover them, since most schedules include garages. The tool was written to work in Excel 97–2003 and later.
A month later the team asked us to make order processing easier, and we built a second macro that:
- groups identical products together and totals the quantity for each;
- sorts lintels by type in the company's order of importance, with any other product codes after them alphabetically;
- groups products by cavity size within each type.
That turned a long, unsorted schedule into a clean picking list.
The same approach suits any manufacturer or merchant that receives customer schedules or bills of materials in one layout and has to rekey them into its own. A macro can do the transfer in seconds and, once the rules are written down, apply them the same way every time.
Also filed under: VBA macros & automation, Manufacturing & engineering
Cascading status drop-downs for a home services company's tradesmen
Home services and trades, Edinburgh · one small project
A home services company had their tradesmen complete a report including cancellation reasons. They wanted one status column where a second, more detailed list depends on the first. It had to be simple enough for every tradesman to use and work in whatever version of Excel they had.
We implemented it with a little code. Clicking the status column opens a pop-up where the user picks the main status and, if there are options, the detailed status, which is written into the cell, with a prompt for a note or date where needed. We made sure it worked across the Excel versions in use, and revised it after feedback.
The same approach suits any form where answers depend on a previous choice: fault codes, categories and reasons.
Also filed under: Forms, trackers & databases, Construction, property & facilities
Sales order printing macro for a cheese maker
Food manufacturing (cheese), Nottinghamshire · one small project
A cheese maker printed sales orders from an Excel macro that pulled each order from its AS400 system and sent it to a different printer depending on the order type, such as mail order, carrier, own transport or backup. The macro failed whenever a PC didn't have exactly the expected list of printers.
We built a small utility to list the printers each PC could see, then revised the macro so it found the right printers reliably and didn't fail when the list differed, testing it with real orders over several weeks.
The same approach suits any business whose Excel tools depend on a particular PC set-up and break when it changes.
Also filed under: Fixing & speeding up spreadsheets, Manufacturing & engineering
Market share model and demand planning for a medical technology company
Medical technology, USA and Canada · two projects, including 12 hours for the second
We built a market share model for a medical technology company's Canadian team, handling double-counting as new data arrived and rolling it forward for the next year. Later another division asked for enhancements to a demand planning sheet, a list of five tasks quoted at 12 hours. We worked with the client's purchasing process: agreeing net-30 payment and invoicing once work was agreed, rather than waiting three months.
The same approach suits commercial and supply chain teams modelling market share and demand in Excel.
Also filed under: Financial models & forecasts, Healthcare & science
Order book and job tracker on SharePoint for an engineering company
Engineering, UK · two projects
An engineering company's order system needed some changes, and later we updated their order book and job tracker to work from SharePoint. For a more detailed example, see how we rebuilt the order management workbooks for a manufacturer.
Also filed under: Fixing & speeding up spreadsheets, Manufacturing & engineering
Excel upgrade fixes for an insurer
Specialty insurance, USA · two small projects
An insurer's report workbooks had problems after upgrading Excel. We upgraded the files, and when an update broke worksheet checkboxes we replaced them with equivalent buttons.
Also filed under: Fixing & speeding up spreadsheets, Financial services & insurance
Dynamic chart training for a county council
Local government, North Yorkshire · two short sessions
A council analyst wanted charts that change with several parameters. We provided training on building dynamic charts and a formula counting back historic months to prevent charting errors.
Also filed under: Dashboards & reports, Education, charities & public sector
Drilling report PDFs for an oil and gas producer
Oil and gas production, Texas · under 2 hours
An oil and gas producer printed casing tally, cement, bit record and material transfer summaries from a drilling workbook. We wrote macros to save the summary reports and the daily drilling report as PDFs.
Also filed under: VBA macros & automation, Energy, utilities & telecoms
Google Sheets job tracker and distance calculation for an electrical contractor
Electrical contracting, UK · 3 hours
An electrical contractor tracked jobs in Google Sheets. We helped extend its formulas so a job's status could show which day of the work it was on, and built a distance calculation between job addresses, deployed over a screen-sharing session.
The same approach suits small contractors running their jobs in Google Sheets.
Also filed under: Forms, trackers & databases, Construction, property & facilities
Data entry form and deliverables report for a project controls analyst
Project controls, Europe · 1 hour for the form, then about 5 hours for a deliverables report
A project controls analyst wanted a form to enter and edit records in a table, with next, previous and save buttons, that coped with a varying number of columns by adding controls as needed. A later project built a deliverables aggregation report refreshed from files in shared cloud storage, set up so the file path works for whoever runs it.
The same approach suits analysts who maintain large tables and want safer data entry.
Also filed under: Forms, trackers & databases, Professional services & technology